COMMERCIAL PROECT
Proposed Brewery/Bar Design within an Existing Building
Program:
You have been contracted to prepare the working drawings/construction drawings for a Brewery within an existing building. There will be a change of use from Warehouse (S) to Brewery (F-2 Low Hazard)
Building Areas
-
There will be no change in "bulk", the building will not be enlarged in anyway. The production facilities will be located within the "high-bay" space.
-
The entire building and all rooms are to be ADA accessible.
-
A clear space of 12'-0" x 5'-0" shall be maintained inside of the overhead door
-
A public entry to the Tasting / Bar Space.
-
A private entry into the Brewery / Production area (existing doors can be maintained)
-
No Air Conditioning is required; however, heat will be. A new hot water heat will need to be installed.
-
650sf Min. Brewery / Brewing / production Area
-
1 Brew Kettle
-
1 Mash Tun
-
1 Hot Liquor Tank
-
1 Brite Tank
-
1 (3) Compartment Sink
-
2 Floor drains
-
Double door to Tasting Area
-
-
250sf Min. Tasting Area / Bar
-
An ADA accessible area at bar
-
-
150sf Office
-
100sf Min of Walk-In Cooler (Assuming wall thickness of 6", to be located on Brewing / Production Area.
-
100sf Min of Walk-In Cooler (Assuming wall thickness of 6", to be located on Brewing / Production Area.
-
ADA accessible commercial restroom for 1 occupant w/1 Toilet and 1 Lavatory
Deliverables:
-
Cover Sheet
-
Site Plan
-
First Floor Plan
-
Reflected Ceiling Plan
-
Roof Plan
-
Building Elevations (Front and Side)
-
250sf min. Tasting Area / Bar
-
An ADA accessible area at bar
-
Interior Elevation of Bar / Tasting Area
-
Two Building Sections (Longitudinal & Cross-Section).
-
Plumbing Riser Diagram
-
Electrical First Floor Plan
-
Door & Window Schedule
![]() Cover Sheet |
---|
![]() General Notes |
![]() Site Plan |
![]() Floor Plan |
![]() Roof Plan |
![]() Front & Rear Elevation |
![]() Left & Right Elevation |
![]() Sectional Views & Detail |
![]() RCP & Electrical Plan |
![]() Interior Elevations |
![]() Plumbing Riser Diagrams |
![]() Renderings Using Lumion |
![]() Exterior Views |
---|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() Vestibule/Hallway |
![]() Restroom |
![]() Interior Views |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() Brewhouse |
![]() |
![]() Cold Room |
![]() Office |

Ending Quote
In order to design a building the first thing architects need to understand is the program, which is an architectural way of saying, “what is your wish list?” or, “how will this building be used?”