Program:

You have been contracted to prepare the working drawings/construction drawings for a Brewery within an existing building. There will be a change of use from Warehouse (S) to Brewery (F-2 Low Hazard)

Building Areas

  1. There will be no change in "bulk", the building will not be enlarged in anyway. The production facilities will be located within the "high-bay" space.

  2. The entire building and all rooms are to be ADA accessible.

  3. A clear space of 12'-0" x 5'-0" shall be maintained inside of the overhead door

  4. A public entry to the Tasting / Bar Space.

  5. A private entry into the Brewery / Production area (existing doors can be maintained)

  6. No Air Conditioning is required; however, heat will be. A new hot water heat will need to be installed.

  • 650sf Min. Brewery / Brewing / production Area

    • 1 Brew Kettle

    • 1 Mash Tun

    • 1 Hot Liquor Tank

    • 1 Brite Tank

    • 1 (3) Compartment Sink

    • 2 Floor drains

    • Double door to Tasting Area

  • 250sf Min. Tasting Area / Bar

    • An ADA accessible area at bar

  • 150sf Office

  • 100sf Min of Walk-In Cooler (Assuming wall thickness of 6", to be located on Brewing / Production Area.

  • 100sf Min of Walk-In Cooler (Assuming wall thickness of 6", to be located on Brewing / Production Area.

  • ADA accessible commercial restroom for 1 occupant w/1 Toilet and 1 Lavatory

Deliverables:

  • Cover Sheet

  • Site Plan

  • First Floor Plan

  • Reflected Ceiling Plan

  • Roof Plan

  • Building Elevations (Front and Side)

  • 250sf min. Tasting Area / Bar

  • An ADA accessible area at bar

  • Interior Elevation of Bar / Tasting Area

  • Two Building Sections (Longitudinal & Cross-Section).

  • Plumbing Riser Diagram

  • Electrical First Floor Plan

  • Door & Window Schedule

Ending Quote

In order to design a building the first thing architects need to understand is the program, which is an architectural way of saying, “what is your wish list?” or, “how will this building be used?” 

bottom of page